Decker Center Remodel

Scroll down to view more

The Decker Center Remodel includes the renovation of an existing one-story, 121,000 square foot area of the Decker Center strip mall located at 2500 Decker Boulevard in Columbia, SC.  Upon completion of the work, the facility will house Richland County’s Central/Traffic Court facility as well as Sherriff’s Region HQ Sub Station and the Warrants Division operations.  The existing building is composed of a steel frame structure (reinforced with steel joists and metal decking) veneered with CMU and insulated metal panels.  The roof system will be replaced with a modified bituminous sheet system.  A water source heat pump system will be used for the majority of the spaces with a make-up air system providing outside air.  Finishes will include, but are not limited to: VCT, terrazzo, ceramic and quarry tile, rubberized flooring, carpet, acoustical ceilings, wall coverings, paint and casework.  Other interior work will include basic electrical services, electrical life safety systems, technology items, and cable trays.  A Detention Center facility will be incorporated into the building for the Sherriff’s Department.  The package also includes site work, utilities, paving and curb & gutter.  An Early Demolition and Asbestos Abatement Package has been completed on site to remove existing interior walls and hazardous materials inside the facility to insure that the site is ready for the new building package to begin.

Brownstone’s Responsibility: Agency CM
Owner: Richland County Government
Dates of Construction: June 2015 – September 2016
Project Size: 121,000 SF of Interior Renovations
Project Budget: $31,000,000
Location: Columbia, SC

Decker CenterDecker Center Floor Plan

Municipal/ September 17, 2015

University of South C… September 17, 2015 USC Law School